This is where we were at the end of another week, late Saturday. The topside panels are now installed on both hulls and you can see from this overview looking into the interiors how deep they are at this stage.

A view from the bows. The hulls are much closer together here where we built them side-by-side than they will be when spread apart to assembly width.

Work on the crossbeams continued as well. Here the beam end caps are fitted and the fairings will go on next. There are small vent holes in the bottom edges of these end caps to prevent damage due to heat expansion in a small, closed space.

The two photos below show that the interiors above bunk level are filleted and sanded and almost ready for primer and paint. We still have the support boxes to build under the crossbeam landing locations. This will be done next week and we should soon be ready for decks and cabin sides.